Stripped deck and clean up stringers Saturday and now fitting new decks Sunday.. Boat is still like new inside
Unconfigured Ad Widget
Collapse
Announcement
Collapse
No announcement yet.
New Boats 2015
Collapse
X
-
Just curious. Assuming the deck was glued and stapled initially, how do you remove the deck without damaging the stringers. Looks to me like a hammer, a chisel, and a dumptruck load of patience would be the only way."In my many years I have come to a conclusion that one useless man is a shame, two is a law firm and three or more is a congress". -- John Adams
Comment
-
basically we hit the areas between the stingers with a hammer and pulled as much as possible off by hand.. Then we went and hand pulled with dikes the staples and then sanded down the stringers to the original wood basically sanding down the deck ply and epoxy.. It really went very well.. It would be no fun doing it by yourself.. With two people we each worked a sideMike - One of the Montana Boys
If it aint fast make it look good
Comment
-
Before hammer banging the ply in non glued areas I have been successful using a router set to just a tad less than the ply thickness. First remove nails or staples then buzz the router with flat bottom bit over the areas of stringers that can be reached, a lot of ply then falls off where not glued. Then hand work for other areas and sand as needed. Easier if not a plunge routerLast edited by ZUL8TR; 01-28-2015, 10:29 AM.
-
Make it easier yet by using a carbide cutter in the router. Set it to exactly the thickness of the plywood and it will buzz right through the tops of old staples and even boat nails along with the wood.
(EDIT) I was asked whether this would work with stainless nails. Never tried it, and wouldn't count on it. Stainless is a demanding material to work, and generally calls for low surface speed and heavy pressure from the cutting tool. If you try it, I'd like to hear how it works.Last edited by Smitty; 02-08-2015, 10:23 AM.
-
-
The cowl is 3 MM and it is doubled at the top . A strut runs from the nose to the dash to tie it togather
Comment
-
New deck is on.. Now just prep work and a coat of protection and the boat will be heading home for final finish.. Hope J Michael likes it and can keep it strait for a couple races.. Also we only took 1 hour to remove deck and fasteners.. Its really not rocket scienceMike - One of the Montana Boys
If it aint fast make it look good
Comment
Comment