This is where we are at now. I have made tappered shims under the cowl to bring it out even with the 1/4 inch coaming walls and have added the motor mount doublers. Also drilled drain holes, added support for entry to the boat and now need to install transom handles, skid fin and bow hook before coating everything with epoxy. Will also permanently install the cowl.
Also working on the C mod to get it ready for the winter Nationals. I am woking on installing the coaming pulleys and cable anchors. Finished attaching the windshield and also made the numbers APBA legal. Still waiting for mirrors and steering cable. Also need to install the throttle. Time is getting short. I also need to lay up two driver ramps. The list goes on and on.
Also working on the C mod to get it ready for the winter Nationals. I am woking on installing the coaming pulleys and cable anchors. Finished attaching the windshield and also made the numbers APBA legal. Still waiting for mirrors and steering cable. Also need to install the throttle. Time is getting short. I also need to lay up two driver ramps. The list goes on and on.
Comment