Basically the areas I have to sand is where stringers attach to the coaming walls and such where there is epoxy squeeze out. Dave is right and what I do is glue on these stringers that attach to the side walls first and make sure all the cross ribs butt up tight in the coaming wall holes to these stringers. The big planning and sanding areas are in the sponson where you have to shape the edges to the matching sponson angles.
Way earlier I said and showed everything getting leveled and squared. It is a criticle step. I do block sand the last couple feet before the bottom just to make sure any high and low spots are gone and to rough up the surface for good glue adhesion. I use a very strait 2x4 with 50 grit paper glued to it. I have two different lengths for the step in the bottom.
Way earlier I said and showed everything getting leveled and squared. It is a criticle step. I do block sand the last couple feet before the bottom just to make sure any high and low spots are gone and to rough up the surface for good glue adhesion. I use a very strait 2x4 with 50 grit paper glued to it. I have two different lengths for the step in the bottom.
Comment